Arbitration and Conciliation Act, 1996 - Section 11 - In this case, Elecon Engineering, the Collaborator, was an inextricable and “veritable” party to the main contract between the Employer and the Contractor because the bid conditions required a Deed of Joint Undertaking (DJU) with joint and several liability, and the